Activity View

The Blue Ocean Activity view shows all activities related to one Pipeline.

Unresolved include directive in modules/blueocean/pages/activity.adoc - include::doc/book/blueocean/_blue-ocean-status.adoc[]

Navigation Bar

The Activity view includes the standard navigation bar at the top and a local navigation bar below it.

Navigation bars from the Activity view

The local navigation bar includes:

Activity

The default tab of the Activity view shows a list of the latest completed or active runs. Each line represents the status of a run, run ID, commit information, and when the run completed.

Default activity tab view of the Activity view

  • Selecting a run will bring up the Pipeline run details to provide Pipeline visualization.

  • Active runs can be aborted from this list by selecting the stop icon, which is represented by a ◾ within a circle.

  • Runs that have been completed can be re-run by selecting the re-run icon ↺.

  • The list can be filtered by branch using the "Branch" drop-down in the list header. Branch filter in Blue Ocean activity view

This view does not allow runs to be edited or marked as favorites. To perform these actions, select the Branches tab.

Branches

The Branches tab shows a list of all branches that have a completed or active run in the current Pipeline. Each line in the list corresponds to a branch in source control, displaying the overall health of the branch based on the status of the most recent run, branch name, commit information, and when the run completed.

Branches tab of Activity view

Selecting a branch brings up the Pipeline run details for the latest completed or active run of that branch.

  1. Pipelines where the latest run has been completed can be run again by selecting the run icon, represented by a in a circle.

    • Active runs can be aborted, and display a stop icon, which is represented by a ◾ within a circle.

  2. Selecting the history icon allows you to view the run history for that branch.

  3. The edit icon, represented by a , opens the Pipeline editor for that branch.

  4. The favorite ☆ icon adds a branch to your favorites list on the dashboard. On the dashboard a branch listed under favorites displays a solid star ★. Deselecting the star removes the branch from the favorites list.

Pull Requests

The Pull Requests tab displays a list of all pull requests for the current Pipeline, that have a completed or active run. Each line in the list corresponds to a pull request in source control, which displays the status of the most recent run, run ID, summary, author, and when the run completed.

Activity Pull Requests view

Blue Ocean displays pull requests and branches separately, but the lists behave similarly. Selecting a pull request in this list will bring up the Pipeline run details for the latest completed or active run of that pull request.

  • Active runs can be aborted from this list by selecting the stop icon, which is represented by a ◾ within a circle.

  • Pull requests whose latest run has been completed can be run again by selecting the run icon, represented by a in a circle.

The pull request list does not display health icons, and pull requests cannot be edited or marked as favorites.

By default, when a pull request is closed, Jenkins removes the Pipeline from Jenkins, and runs for that pull request are no longer accessible from Jenkins. The Pipelines removed in this way will need to be cleaned up in the future. This can be changed by adjusting the configuration of the underlying multi-branch Pipeline job.